OngoingThe second phase of a high-rise residential development in Moscow. Global MEP handles the entire engineering scope of a facility exceeding 100,000 m². Work on the facility is ongoing.
- CLIENT / GENERAL CONTRACTOR
- PIONEER / Antteq
- LOCATION
- Moscow, Russia
- AREA
- 106,865 m²
- START YEAR
- 2024
- STATUS
- Ongoing
ENGINEERING DISCIPLINESElectricalELVHVACPlumbing